Integration testing : Divide into the following three approaches
- all-at-once
- bottom-up
- Top-down
Top down: Testing will start from the lop Integrated level modules and connect to the branch level modules.
all-at -once : it will Combine both top level and botton level members.
No comments:
Post a Comment